The few last weeks lots of time has
been spent cleaning and cutting out the floor pans.
The one on the right hand has been welded, the one on the left hand side is
still loose.
In the meantime the Mustang stands on blocks, to be able to clean the bottom.
04/11/2007: Meanwhile the floorpans
are getting in.
I've also been sanding some other small parts, as prepartion to paint them.
04/14/2007: After some hard and
more continuous work, the floor pan for the passenger side is installed.
I've also treated them with FERTAN (against rust) and afterwards with FERPOX,
and Epoxy-primer.
05/13/2007: Finally the LH-side is
also finished.
It only needs to be primed.